Name of Project Poultry Litter based Power Project in Namakkal, Tamil Nadu by M/s. G.K. Bioenergy Pvt. Ltd

Location of the project (village / District / State) Namakkal, Tamil Nadu

Brief Description of the project The proposed project involves the collection of Poultry litter from 12 poultries with a population of 1.5 million birds accounts for 200TPD of litter cumulatively. The collected litter will be transported to the plant where the litter will be processed in a high rate bio-methanation digester for optimal methane generation. This gas will then used for power generation and the installed plant generation capacity is 1.5MW. The generated power will be supplied to the state grid through the PPA made with TNEB. This project claims for the CERs from both the methane recovery in the poultry litter & the power generated from the project that replaces the fossil fuel based grid.

Estimate of GHG abatement in tCO2 eq. 96000

Host Country Approval Status Approved

Project Owner / Proponent Mr. Palanisami Subramani, Director, G.K. Bioenergy Pvt. Ltd. G 112, 9th Street, Anna Nagar, Chennai, TamilNadu Tel: 044-2642 7577 Fax: 044-2641 1788

Baseline methodology Approved SSC Type I.D. ‘Renewable Energy Projects for grid’ Type III.D. ‘Other project activities, methane recovery’

Project start date March 2001

Project completion date July 2005

Demand side energy efficiency programmes for specific technologies

January 4th, 2009

Name of Project Demand side energy efficiency programmes for specific technologies at ITC Bhadrachalam Pulp and paper making facility in India, in Andhra Pradesh by ITC Ltd

Location of the project (village / District / State) Andhra Pradesh

Brief Description of the project The proposed CDM project is from the energy efficiency activities taken in the Paper plant. Following are the activities taken in the plant;
1. Replacement of inefficient equipment (pumps, compressors, lamps) with energy efficient alternatives.
2. Application of retrofit measures fro various types of equipment through measures such as power factor improvement, harmonic filters, variable frequency drives etc.,
Both the activities collectively save 13.383 MU annually

Estimate of GHG abatement in tCO2 eq. 79191.07

Host Country Approval Status Approved

Project Owner / Proponent ITC Ltd.-Paper boards and specialty papers division, Unit: Bhadrachalam, Sarapaka, 106, Sardar Patel Road, Secunderabad, Andhra Pradesh 500003 Contact Person: Mr. Pradeep Dhobale, Managing Director, CEO, Tel: +91 (040) 27846566- 73 Fax: +91 (040) 2784 2997 Email: Sanjay.Singh@itc.co.in

Price water house Coopers (P) Ltd. 252, Veer Savarkar Marg,Shivaji Park, (Opp. Shivaji Park
Maidan,Next to Mayor’s Bungalow) 3rd Floor, A Wing, Dadar (W), Mumbai, Maharastra – 400028 Contact Person: Mr. P. Ram Babu, Associate Director Tel: +91 (022) 5669 1000 (Board), 5669 1496 (Direct) Fax: +91 (022) 24913417 Email: ram.babu@in.pwc.com

Baseline methodology Approved SSC Type II C. ”Demand Side energy Efficiency programmes for specific technologies”

Project start date 2002

Project completion date August 2005

13.40 MW Bundled Wind Power Project in Chitradurg

January 3rd, 2009

Name of Project 13.40 MW Bundled Wind Power Project in Chitradurg, Karnataka

Location of the project (village / District / State) Chitradurg, Karnataka

Brief Description of the project The proposed project activity involves the installation of WEGs of various capacities (750 kW, 1650 kW) in & around of Dist Chitradurg, Karnataka and the project consist of individual sub-projects. The project will generate 39.2 MU with a high capacity utilization factor more than 28 – 30% which will be sold to State grid. The technical design of WEGs is from NEG Micon A/S, Denmark.

Estimate of GHG abatement in tCO2 eq. 379848

Host Country Approval Status Approved

Project Owner / Proponent Carbon Advisory Services, NEG MICON (I) Pvt. Ltd., 298 Old Mahabalipuram Road, Sholinganallur, Chennai, Tamil Nadu 600119 Tel: 044-2450 5044, 5100 Fax: 044-2450 5101

PDD Developer / Consultant Carbon Advisory Services, NEG MICON (I) Pvt. Ltd., 298 Old Mahabalipuram Road, Sholinganallur, Chennai, Tamil Nadu 600119 Tel: 044-2450 5044, 5100 Fax: 044-2450 5101

Baseline methodology Approved Type I D “Approved Methodology for Small Scale Project Activity”

Designated Operational Entity (DOE) Det Norske Veritas (DNV)

Project start date January 2000

Project completion date Projects were completed in various phases between 2000 & 2001

21 MW Bundled Wind Power Project

January 3rd, 2009

Name of Project 21 MW Bundled Wind Power Project at Vankusawade, Maharashtra

Location of the project (village / District / State) Vankusawade, Maharashtra

Brief Description of the project The proposed project activity involves the installation of WEGs of various capacities (750 kW, 1650 kW) in & around of Dist Vankusawade, Karnataka. The project will generate 39.2 MU with a high capacity utilization factor more than 28 – 30% which will be sold to State grid. The technical design of WEGs is from NEG Micon A/S, Denmark. The separate response furnished does not provide the bundler details clearly.

Estimate of GHG abatement in tCO2 eq. 360640

Host Country Approval Status Approved

Project Owner / Proponent M/s NEG MICON India (Pvt) Ltd 298 Old Mahabalipuram Road, Sholinganallur, Chennai, Tamil Nadu 600119 Tel: +91 (044) 2450 5044, 5100 Fax: +91 (044) 2450 5101

Baseline methodology ACM 002 “Consolidated baseline methodology fro grid connected electricity from renewable sources”

Project start date January 2000

Project completion date Projects were completed in various phases between 2000 & 2001

Waste Heat Recovery based steam and power generation

January 3rd, 2009

Name of Project Waste Heat Recovery based steam and power generation in Jamshedpur, Jharkhand by Tata Steel Ltd.

Location of the project (village / District / State) Jamshedpur, Jharkhand

Brief Description of the project The integrated steel plant of TSL generates gases such as Blast Furnace Gas (BFG), Coke Oven Gas (COG), and Basic Oxygen Furnace Gas (BOFG) in its operating units. A part of this gas is being utilized for steam generation in the existing boilers with coal and the remaining is flared. In this proposed project heat content in the waste gas earlier lost in the atmosphere will be utilized for steam generation and the steam generated will be utilized for the plant process and for power generation. This will be achieved by converting all the boilers in plant to 100% waste gas firing, thereby completely eliminating the coal consumption and corresponding CO2 emissions. The system uses advance gas burners to ensure the uniformity of heating. The new (combined heat and power) system is designed as an energy efficient regenerative cycle.

Estimate of GHG abatement in tCO2 eq. 6607405

Host Country Approval Status Approved

Project Owner / Proponent M/s Tata Steel Ltd. (TSL) Jamshedpur, Jharkhand 831001 Contact Person: Mr. R.P. Sharma, Chief (Environment & Occupational Health), Tel: +91 (0657) 2424125 Fax: +91 (0657) 2424098

Baseline methodology NM 0107 “Baseline methodology for waste gas based cogeneration system for power and steam generation”

Project start date October 2003

Project completion date Not Applicable?

Blended cement projects at Maratha Cement plan

January 3rd, 2009

Name of Project Blended cement projects at, Maratha Cement plan, Maharashtra; Gujarat unit; Himachal unit; Ropar unit; Rabriyawar unit, Rajasthan; by Gujarat Ambuja Cement Ltd.

Location of the project (village / District / State) Maharashtra, Gujarat, Himachal, Ropar, Rabriyawar & Rajasthan

Brief Description of the project The project activity consists of an increase in the blending of fly ash in the Pozzolanic Portland Cement (PPC), or blended cement produced by GACL. Thus the project claims for the CERs associated with the clinker displacement associated with fly ash addition in PPC production. The current average percentage blend of fly ash in the brand is 24%, and the project activity consists of a target rate of 30% and above.

Estimate of GHG abatement in tCO2 eq. 817426

Host Country Approval Status Approved

Project Owner / Proponent M/s Gujarat Ambuja Cement Ltd. (GACL) CST Road, near Vidya nagari, Kalina Santacruz, Mumbai, Maharashtra 400098 Contact Person: Mr. A.V. Rao, Chief of Projects, Tel: +91 (022) 5507 0504 Fax: +91 (022) 2652 1414

Baseline methodology Proposed NM 0095

Project start date 1 April 2004

Project completion date 1 April 2014 (?)

Grid connected Bagasse based cogeneration project in Karnataka

January 3rd, 2009

Name of Project Grid connected Bagasse based cogeneration project in Karnataka by the Ugar Sugar Works Ltd

Location of the project (village / District / State) Karnataka

Brief Description of the project The proposed project involves the installation of a new cogen unit of 16MW next to its existing 28MW co-gen unit, which exports 70GWH power to the grid. USWL has expanded its sugar crushing capacity, resulting in increased availability of bagasse. The project installs a high-pressure boiler of 80TPH, 20MW high-pressure turbine, bagasse dryer and other associate d equipments. The generated power will be exported to the grid. How much?

Estimate of GHG abatement in tCO2 eq. 1069648

Host Country Approval Status Approved

Project Owner / Proponent M/s The Ugar Sugar Works Ltd Ugar Khurd, Belgaum (Dt) Karnataka – 591 316 Contact Person: Mr. Vinayak Rajendra Shirgaokar, Chairman & Managing Director, Tel: +91 (08339) 272230 Fax: +91 (08339) 272232

Baseline methodology ACM XXXX “Consolidated baseline methodology for grid-connected electricity generation from biomass residues”

Project start date May 2002

Project completion date November 2003

6.75 MW small scale grid connected

January 2nd, 2009

Name of Project 6.75 MW small scale grid connected, Wind electricity generation project in Tamil Nadu, by Tamil Nadu Newsprint and Papers Ltd (TNPL)

Location of the project (village / District / State) Tamil Nadu

Brief Description of the project The project activity involves the implementation & operation of 6.75MW (0.75MW x 4 No. & 1.25MW x 3No.) WEGs. The project generates approximately 16MU of clean electricity annually, out of which about 14.5MU is fed to Tamil Nadu Electricity Board through a long-term power purchase agreement. The project is under operation & supplied 3000 units of electricity in the year 2000-01, which has gone up to 15.73MU in 2004-05.

Estimate of GHG abatement in tCO2 eq. 108096

Host Country Approval Status Approved

Project Owner / Proponent M/s Tamil Nadu Newsprint and Papers Ltd (TNPL) 67, Mount Road, Guindy Chennai, Tamil Nadu 600032 Contact Person: Mr. S. Udaya Sankar, Chief Manager (Projects), Tel: +91 (04324) 277001-10 Fax: +91 (04324) 277027

Baseline methodology Approved SSC Type I.D. “Renewable electricity generation for a grid”

Project start date March 29, 2001

Project completion date 2004

Efficiency improvement of blow heat recovery system

January 2nd, 2009

Name of Project Efficiency improvement of blow heat recovery system at Bhadrachalam PSPD unit by ITC Ltd

Location of the project (village / District / State) Bhadrachalam

Brief Description of the project The purpose of the project activity is to upgrade the design of existing blow heat recovery system at the pulp digester mill to recover additional flash steam available at the disposal and increase the efficiency of heat exchange between flash steam and fresh water. The project involves retrofitting the existing BHRS to recover 100% flash steam during the pulp blow down period from the digester and efficiently transfer the heat of the flash steam to the fresh water to increase its temperature by 70C. After implementation of all the measures adopted in the BHRS, it was observed that the specific steam consumption fro production of one ton of hot water has reduced from 0.0482 ton of steam to 0.0063 ton of steam, lead with GHG reduction.

Estimate of GHG abatement in tCO2 eq. 353555.2

Host Country Approval Status Approved

Project Owner / Proponent ITC Ltd.-Paper boards and specialty papers division, 106, Sardar Patel Road, Secunderabad, Andhra Pradesh 500003, Contact Person: Mr. Pradeep Dhobale, MD, CEO, Tel: +91 (040) 2784 6561, 62, 66-73 Fax: +91 (040) 2784 2997, 2784 6562 Email: Pradeep.Dhobale@itc.co.in

Price water house Coopers (P) Ltd. 252, Veer Savarkar Marg,Shivaji Park, (Opp. Shivaji Park Maidan,Next to Mayor’s Bungalow) 3rd Floor, A Wing, Dadar (W), Mumbai, Maharastra – 400028 Contact Person: Mr. P. Ram Babu, Associate Director Tel: +91 (022) 5669 1000 (Board), 5669 1496 (Direct) Fax: +91 (022) 24913417 Email: ram.babu@in.pwc.com

Baseline methodology Approved AM 0018 ”Steam Optimization System”

Project start date June 2003

Project completion date July 2003

Reduction of steam consumption through revamping of Ammonia plant

January 2nd, 2009

Name of Project Reduction of steam consumption through revamping of Ammonia plant at Aonla and Phulpur in U.P. and Kalol in Gujarat by IFFCO

Location of the project (village / District / State) Aonla & Phulpur, Uttar Pradesh Kalol, Gujarat

Brief Description of the project The objective of the proposed project is to upgrade the existing plant technology and to reduce the specific energy consumption; 16 schemes have been envisaged to be implemented under the energy saving projects in Aonla, Phulpur, Kalol Plants. The various project energy efficiency measures reduces SSCR (Specific Steam Consumption Ratio) & the reduction of SSCR would lead to reduction in fossil fuels consumption in the boilers, which would in turn reduce CO2 emissions of the plant.

Estimate of GHG abatement in tCO2 eq. 1576266

Host Country Approval Status Approved

Project Owner / Proponent Indian Farmers Fertilizer Cooperative Ltd (IFFCO) IFFCO House, 34 Nehru Place, New Delhi-110019, Contact Person: Mr. Subhash Chandra,
Executive Director (Tech), Tel: +91 (011) 2643 2507, 2510, Fax: +91 (011) 2646 3833, 2647 8007

Baseline methodology Approved AM0018 “Baseline methodology for steam optimization systems”

Project start date November 2004

Project completion date June 2006