GIPPL Waste Heat based 11.5 MW Captive Power Project

Written by Prakash Friday, 20 March 2009 04:09

Name of the Project “GIPPL Waste Heat based 11.5 MW Captive Power Project” by (i) M/s Gopani Iron and Power (India) Private Limited and (ii) M/s Lloyds Steel Industries Limited.

Location of the Project (Village / District / State) Village Tadali, District: Chandrapur, Maharashtra

Brief Description of the project The project activity generates 11.5 MW electricity by generating steam using waste heat contained in the waste flue gases coming out from each After Burning Chamber (ABC) of 4 numbers 100 TPD Direct Reduced Iron (DRI) Sponge Iron Kilns. The heat contained in 27000 NM 3/ h of waste gases approximately at 1000 deg c coming out of each ABC will be transferred to water and the heat converts water in to steam in 4 numbers Waste Heat Recovery Boilers (WHRBS) each producing 12 tonnes/h steam. Steam generated from 4 WHRBS is combined in a header which also receives 12.3 tonnes/h of steam from coal based FBC boiler (FBCB) so that total 60.3 tonnes/hr of steam at and 490 deg C will be fed into the steam turbo-generator (STG) to generate 15 MW electricity.

Estimate of GHG abatement in tCO2 eq. 382053

Host Country Approval Status Approved.

Project Owner / Proponent Mr. Jignesh Gopani, Managing Director M/s Gopani Iron and Power (India) Private Limited, MIDC growth centre, A-22, Tadali, Maharashtra – 442406

Baseline methodology Approved methodology. Consolidated baseline methodology for waste gas and/or heat and/or pressure for power generation.ACM0004/ Version 02, Sectoral scope : 01, 3rd March 2006.

Project Start Date 15-10-2005.

Project Completion Date September 2007