BHL Budhana project
Written by Prakash Tuesday, 10 March 2009 04:42
Name of Project “BHL Budhana project” at Bajaj Hindusthan Ltd. by M/s Bajaj Hindusthan Ltd
Location of the Project (Village / District / State) Muzaffarnagar District, Uttar Pradesh
Brief Description of the Project The project activity involves the installation of a new boiler manufactured by WIL. The boiler will have a capacity of 90tph, the outlet pressure and temperature of the boiler will be 45 kg/cm2 and 450oC respectively. The two new turbine generators are manufactured by Triveni and will have a capacity of 10MW (back pressure) and 12MW (condensing cum extraction) operating at a pressure and temperature of 45 kg/cm2 and 450oC respectively.
Estimate of GHG abatement in tCO2 eq. 298,578
Host Country Approval Status Approved
Project Owner / Proponent M/s Bajaj Hindusthan Ltd.
Baseline Methodology Version 03 of ACM0006 – Consolidated methodology for grid-connected electricity generation from biomass residues.
Project Start date 1st April, 2006.
Project completion date 15th December 2006.
Recently Added
- CDM Potential of Sweet Sorghum
- IFFCO sells INR 40 million worth Carbon Credits to Spanish Co
- KSEB Scouts for consultant to Validate CDM Projects.
- Consultancy Services Required in the field of Carbon Credits
- 2 x 3.5 MW Ullunkal Hydro Power Project in Kerala, India.
- Rakchad Small Hydro Electric Project
- 8MW biomass based power plant at Phagwara
- Wind based renewable energy project in Gujarat
- 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh.
- Gorai Landfill closure and Gas Capture Project, Mumbai, India