BHL Barkhera Kalan project
Written by Prakash Tuesday, 10 March 2009 04:44
Name of Project “BHL Barkhera Kalan project” at Bajaj Hindusthan Ltd by M/s Bajaj Hindusthan Ltd.
Location of the Project (Village / District / State) Pilibhit District, Uttar Pradesh
Brief Description of the Project The project activity will install two high pressure / temperature boilers of 90tph capacity manufactured by IJT. The outlet pressure and temperature of the boilers will be 45 kg/cm2 and 450oC respectively. Three new turbines will be installed. One will be of 12MW (condensing cum extraction) capacity manufactured by Triveni. The other two back pressure type turbines will be of capacity 10MW and 3MW and are manufactured by Belliss. All turbines operate at a pressure and temperature of 45 kg / cm2 and 450oC respectively.
Estimate of GHG abatement in tCO2 eq. 214,218 (from 2007)
Host Country Approval Status Approved
Project Owner / Proponent M/s Bajaj Hindusthan Ltd.
Baseline Methodology Version 03 of ACM0006 – Consolidated methodology for grid-connected electricity generation from biomass residues.
Project Start date 1st September, 2005
Project completion date 15th December 2006.
Recently Added
- CDM Potential of Sweet Sorghum
- IFFCO sells INR 40 million worth Carbon Credits to Spanish Co
- KSEB Scouts for consultant to Validate CDM Projects.
- Consultancy Services Required in the field of Carbon Credits
- 2 x 3.5 MW Ullunkal Hydro Power Project in Kerala, India.
- Rakchad Small Hydro Electric Project
- 8MW biomass based power plant at Phagwara
- Wind based renewable energy project in Gujarat
- 10 MW bundled Luni–III & Luni–II hydroelectric projects for a grid system at Sri Sai Krishna Hydro Energies Private Limited in Kangra District, Himachal Pradesh.
- Gorai Landfill closure and Gas Capture Project, Mumbai, India