Name of Project “BHL Barkhera Kalan project” at Bajaj Hindusthan Ltd by M/s Bajaj Hindusthan Ltd.

Location of the Project (Village / District / State) Pilibhit District, Uttar Pradesh

Brief Description of the Project The project activity will install two high pressure / temperature boilers of 90tph capacity manufactured by IJT. The outlet pressure and temperature of the boilers will be 45 kg/cm2 and 450oC respectively. Three new turbines will be installed. One will be of 12MW (condensing cum extraction) capacity manufactured by Triveni. The other two back pressure type turbines will be of capacity 10MW and 3MW and are manufactured by Belliss. All turbines operate at a pressure and temperature of 45 kg / cm2 and 450oC respectively.

Estimate of GHG abatement in tCO2 eq. 214,218 (from 2007)

Host Country Approval Status Approved

Project Owner / Proponent M/s Bajaj Hindusthan Ltd.

Baseline Methodology Version 03 of ACM0006 – Consolidated methodology for grid-connected electricity generation from biomass residues.

Project Start date 1st September, 2005

Project completion date 15th December 2006.