Energy Efficiency Measures at Cement Production Plant
Name of Project “Energy Efficiency Measures at Cement Production Plant in Central India” at Satna, Madhya Pradesh
Location of the project (village / District / State) Satna, Madhya Pradesh
Brief Description of the project The basic objective of the project is to reduce energy consumption per tonne of clinker production through implementation of energy efficient technologies at BCL Satna. The main thrust areas were identified as use of flow control, use of more efficient equipment and technology upgradation. All these improved technology measures had helped in reducing the direct demand of electricity and indirect demand of fossil fuel (coal).
Estimate of GHG abatement in tCO2 eq. 110975
Host Country Approval Status Approved
Project Owner / Proponent M/s Birla Corporation Ltd. (Unit-Durgapur Cement Works) 9/1 R.N. Mukherjee Road, Birla Building, Kolkata, West Bengal 700 001 Contact Person: Mr. V.S. Panwar, Vice President (Projects), Tel: +91 (033) 2213 1680, 88, 89 Fax: +91 (033) 2248 3239 Email: tcs@birlacorp.com
Baseline methodology Small scale Type II.D
Project start date March 2000
Project completion date March 2003