MSPSPL Waste Heat Recovery based captive power project
Name of Project “MSPSPL Waste Heat Recovery based captive power project” at Jamgaon, Raigarh, Chhattisgarh by M/s MSP Steel & Power Ltd
Location of the project (village / District / State) Jamgaon, Raigarh, Chhattisgarh
Brief Description of the project The purpose of the project activity is to generate 16 MW electricity through waste heat recovery boilers (WHRB), to meet the in-house requirements. Heat energy from waste gas available at the outlet after the burning chamber of the DRI plant will generate steam in the WHRB. The high-pressure boiler along with the high efficiency fully condensing type multistage Steam Turbine & Generator (STG) sets will ensure that maximum power output is obtained from the waste gases.
Estimate of GHG abatement in tCO2 eq. 478004
Host Country Approval Status Approved
Project Owner / Proponent M/s MSP Steel & Power Ltd. 16/S, Block A, New Alipore, Kolkata, West Bengal. Contact Person: Mr. Saket Agrawal, Director, Tel: +91 – 9830330909 Email: saket.agrawal@mspsteel.com
Baseline methodology ACM 0004 ‘Consolidated baseline methodology for waste gas and/or heat for power generation’
Project start date August 2004
Project completion date November 2005
Twitter
