MSPSPL Waste Heat Recovery based captive power project

January 14, 2009 by Prakash  
Filed under Energy

Name of Project “MSPSPL Waste Heat Recovery based captive power project” at Jamgaon, Raigarh, Chhattisgarh by M/s MSP Steel & Power Ltd

Location of the project (village / District / State) Jamgaon, Raigarh, Chhattisgarh

Brief Description of the project The purpose of the project activity is to generate 16 MW electricity through waste heat recovery boilers (WHRB), to meet the in-house requirements. Heat energy from waste gas available at the outlet after the burning chamber of the DRI plant will generate steam in the WHRB. The high-pressure boiler along with the high efficiency fully condensing type multistage Steam Turbine & Generator (STG) sets will ensure that maximum power output is obtained from the waste gases.

Estimate of GHG abatement in tCO2 eq. 478004

Host Country Approval Status Approved

Project Owner / Proponent M/s MSP Steel & Power Ltd. 16/S, Block A, New Alipore, Kolkata, West Bengal. Contact Person: Mr. Saket Agrawal, Director, Tel: +91 – 9830330909 Email: saket.agrawal@mspsteel.com

Baseline methodology ACM 0004 ‘Consolidated baseline methodology for waste gas and/or heat for power generation’

Project start date August 2004

Project completion date November 2005

Speak Your Mind

Tell us what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!