Name of the Project “LKPPL Fuel switch project for generation of cleaner power” by M/s Lanco Kondapalli Power Private Limited
Location of the Project (Village / District / State) IDA, Kondapalli, Krishna District, Andhra Pradesh
Brief Description of the project The Combined Cycle Power Project (CCPP) with installed capacity of 360.788 MW comprises of two () Gas Turbine (GT) Generating units of GE Alstom, France, two () Waste Heat recovery Generators (HRG) of Hanjung, Korea and one common Steam turbine Generating (STG) unit of Alstom, France, along with all Electrical Systems, Control and Instrumentation, Civil, Structural and Architectural works. The power generated from the Gas Turbine and Steam Turbine Generating Units is stepped upto 0 KV by generator transformers and APTRANSCO’s 0 KV transmission lines evacuate Power through Kondapalli 0 KV Substation. The Power project was designed for use of liquid fuel like naptha. In the project activity, gas based combined cycle configuration has been used for power generation with natural gas as primary fuel. Heat recovery units and steam turbines maximizes cycle efficiency and power output.
Estimate of GHG abatement in tCO eq. 595111
Host Country Approval Status Approved.
Project Owner / Proponent Mr. Pandu Ranga Rao, CEO M/s Lanco Kondapalli Power Private Limited. 141, Avenue #8, Banjara Hills, Lanco House, Hyderabad – 5000 34, Andhra Pradesh
Baseline methodology Approved Baseline methodology.
Project Start Date August 2000
Project Completion Date 10th September 2001
Incoming search terms for the article:
- lkppl
- Lanco Kondapalli Power Project
- LKPPL CDM PROJECT
- private companies generating power in andhra pradesh
- status of cdm project at lkppl
CDM Projects is available as Excel Database. Interested? Click Here
Carbon Credits Explained: