23.5 MW Waste Heat Recovery Based Power Project
Name of the Project 23.5 MW Waste Heat Recovery Based Power Project
Sub-bundle I – 5 MW at Kalunga
Sub-bundle II – 16 MW at Ratnapur
Location of the Project (Village / District / State) Village : Site I: Kalunga, Site II: Ratnapur District: Sundargarh, State:Orissa
Brief Description of the project The WHR based power plant primarily consists of installation of WHR boiler, turbo generator set and other auxiliaries. The exhaust waste gases of the DRI kiln are received at the modified after burning chamber (ABC) for further incineration. After incineration, the waste gases are passed through the Waste Heat Recovery Boiler (WHRB) with steam generating parameters of 67 kg/cm (g) pressure & 4850C temperature. The WHRB transfers the sensible heat energy of the waste gases to generate steam. The steam thus generated is sent to a steam header and subsequently to a high efficiency, extraction – cum condensing type Steam Turbo Generator (STG) set of 5 & 16 MW (5 MW) rated capacity.
Estimate of GHG abatement in tCO eq. 1009221
Host Country Approval Status Approved.
Project Owner / Proponent Mr. D. M. Sanyal, Executive Director M/s. Shree Mahavir Ferro Alloys Pvt. Ltd (SMFAPL), L – 10, Civil Township, Rourkela, Dist.: Sundergarh. Orissa-769004
Baseline methodology Approved. ACM0004 / Version 0
Project Start Date 15th July 2005
Project Completion Date 15th September 2007