Co-generation Power Project of Gem Sugars Limited

Name of Project 22.5 MW Bagasse Co-generation Power Project of Gem Sugars Limited (GSL)” at Kundargi Village, Biligi Taluk, Bagalkot District, Karnataka

Location of the Project (Village / District / State)
Kundargi Village, Biligi Taluk, Bagalkot District, Karnataka.

Brief Description of the project The cogeneration project originally envisaged with two turbines, viz. Phase-1 with 15 MW extraction cum condensing turbine for export and Phase-2 with 0 MW backpressure turbine for captive consumption. The project is a grid connected bagasse based cogeneration power plant with a high pressure steam turbine
configuration. The project comprises of 90 tons per hour (TPH) capacity steam generator with the outlet steam parameters of 67 kg/cm2 and 485º C coupled with 15 MW capacity turbine generator set of double extraction cum condensing (DEC) type and 40 TPH boiler with the outlet steam parameters of 64 ata and 4800C with 6 MW backpressure turbine.

Estimate of GHG abatement in tCO2 eq. 238,42

Host Country Approval Status Approved

Project Owner / Proponent M/s Gem Sugars Limited, 120, Cunningham Road Hoodi Apartments, Bangalore - 560 052, Karnataka Contact Person: Mr. K. Marimuthu, V. P. (Finance)

Baseline methodology Approved Consolidated Methodology ACM0006, version 03, scope 01–“Consolidated Baseline methodology for grid connected electricity generation
from biomass residue”

Project Start Date Phase I - October, 2000, Phase II – April 2005

Project Completion Date Phase I – October, 2002 Phase II – April 2007